Friday, 5 March 2010

The Code for Sustainable Homes: Case Studies

It takes approximately 18 months to design and build a home, therefore it is only now that Code Homes have been completed since the policies inception in 2007. This publication sets out a number of detailed case studies on actual Code Homes. The case studies show the different ways of achieving various levels of the Code and also highlights potential pit-falls for developers. Click on the CLG logo below to find the download to the Case Study and look out for the link to the second volume of Case Studies in the Related Documents section on the same page.

No comments: